|
Product Details:
Contact Now
Chat Now
|
| Coverage: | 1.5-2.0 M²/kg | Weight: | 20KG |
|---|---|---|---|
| Type: | Bituminous | Specification: | 20kg/barrel |
| Shape: | Liquid, Liquid | Dryingtime: | 2-4 Hours |
| Product Series: | Coating Series | Applicationmethod: | Brush, Roller, Spray |
| Material: | Modified Bitumen | Waterresistance: | High |
| Form: | Liquid | Temperatureresistance: | -20°C To 80°C |
| Packaging Form: | Iron Bucket | Reinforcement: | Polyester |
| Design Style: | Industrial | ||
| Highlight: | rubberized asphalt waterproof coating,asphalt waterproof coating two component,rubberized bituminous foundation coating |
||
Two-Component Spray-On Rapid-Curing Rubberized Asphalt Waterproof Coating consists of Component A (base agent) and Component B (coagulant). Component A is a mixture of anionic synthetic rubber emulsion, emulsified asphalt microemulsion made by special technology, and various chemical additives. It forms a core-shell structure with rubber as the continuous phase and asphalt as the dispersed phase, featuring high solid content and low viscosity, suitable for spray construction. Component B is an aqueous solution of electrolytes such as metal salts prepared at a corresponding concentration.
Component A and Component B are respectively sprayed and atomized at high speed in a fan shape through two nozzles of airless spraying equipment. After cross-colliding, mixing and spraying onto the base surface, the base agent (Component A) breaks the charge stability of the polymer emulsion and emulsified asphalt under the action of the coagulant (Component B), causing rapid demulsification, salting out of water, and instant coagulation into a polymer film.
The product is applied by special spraying equipment. At room temperature, the two components are respectively sprayed and atomized through pipelines via two nozzles, mixing at high speed. The material coagulates into a film instantly after being sprayed onto the base surface. The construction method offers high spraying efficiency, saves labor, shortens the construction period, and reduces construction costs.
| Item | Content |
|---|---|
| Origin | Shandong |
| Brand Name | Qilu Zhuowang |
| Certification | MA, CNAS |
| Model | Type I |
| Item | Content |
|---|---|
| Minimum Order Quantity | 50 Barrels |
| Price | To be negotiated |
| Packaging Details | Wooden Pallet |
| Delivery Time | 30 Days |
| Payment Terms | Full Payment Before Shipment |
| Supply Capacity | 500 Barrels Per Day |
Contact Person: Mrs. Yuki
Tel: +8613210747040
Fax: 86--13210747040